Main bathroom project · Redcliffe, Queensland

Redcliffe Main Bathroom Renovation

A main bathroom redesign in Redcliffe, documented through before-and-after photographs and the original layout plan.

Bathrooms Are Us supplied a project budget of $31,500 and a completion timeframe of two months for this renovation. Explore the photographs below, then take a closer look at the design brief and proposed layout.

Location
Redcliffe, QLD
Project
Main bathroom
Project budget
$31,500
Completion timeframe
2 months

The finished bathroom

After the renovation

Four views of the completed Redcliffe main bathroom. Select a photograph to open the full-size image.

Redcliffe main bathroom after renovation, project photograph 1
After renovation · View 1
Redcliffe main bathroom after renovation, project photograph 2
After renovation · View 2
Redcliffe main bathroom after renovation, project photograph 3
After renovation · View 3
Redcliffe main bathroom after renovation, project photograph 4
After renovation · View 4

The design brief

Rethinking the bathroom layout

The client’s brief was to redesign the main bathroom. The draft proposal set out a reconfiguration of the bathroom and separate toilet area, including removal of the dividing wall, subject to site inspection, and changes to the doorway.

The supplied layout brings the bath, vanity, shower and toilet together in one room. It places a separate bath along one wall and the shower beside the toilet, with the vanity positioned near the entrance.

This project is part of the work completed by Bathrooms Are Us across Brisbane’s Northside.

Project budget and timeframe

The client supplied a $31,500 project budget and a two-month completion timeframe. The draft proposal lists its $31,500 total as including GST, with the QBCC insurance charge listed separately.

These figures relate to this past project. They are not a current quotation or a fixed price for other renovations. Scope, selections and site conditions affect the cost and timeframe of each bathroom.

The starting point

Before the renovation

These three photographs record the bathroom before work began.

Redcliffe main bathroom before renovation, project photograph 1
Before renovation · View 1
Redcliffe main bathroom before renovation, project photograph 2
Before renovation · View 2
Redcliffe main bathroom before renovation, project photograph 3
Before renovation · View 3

Planning the space

The proposed bathroom layout

The original plan shows how the main fixtures were arranged within the redesigned room:

  • A separate bath along the rear wall.
  • A 1200 mm wall-hung vanity.
  • A shower area marked 900 × 1300 mm, with a recessed wall niche and strip grate.
  • A back-to-wall toilet and a towel ladder near the entrance.

This is the supplied design plan, rather than an as-built drawing. Product selections and dimensions in a draft proposal may change during a renovation.

Proposed Redcliffe main bathroom layout showing a separate bath, 1200 mm wall-hung vanity, 900 by 1300 mm shower and toilet
Original layout plan supplied by Bathrooms Are Us.