Bathroom & powder room project · Redcliffe, Queensland
Redcliffe Bathroom & Powder Room Renovation
A coordinated redesign of a Redcliffe main bathroom and powder room, with laundry facilities incorporated into the main bathroom design.
Bathrooms Are Us completed this project with a reported budget of $34,500 and a completion timeframe of two months. Browse the photographs below to see the rooms before work began and the finished renovation.
- Location
- Redcliffe, QLD
- Project
- Bathroom & powder room
- Project budget
- $34,500
- Completion timeframe
- 2 months
The completed project
After the renovation
Three photographs of the completed Redcliffe project. Select a photograph to open the full-size image.
The design brief
Redesigning the main bathroom and powder room
The brief brought the main bathroom and separate powder room into one renovation project. The proposed main bathroom layout made space for a walk-in shower, vanity and laundry facilities, while the powder room design paired a basin and vanity with a toilet.
The draft proposal and conceptual plans set out the following design intentions:
- Remove the existing bath and create a walk-in shower with a fixed glass panel and recessed wall niche.
- Incorporate an undermount laundry bowl and retain the washing machine and dryer within the main bathroom layout.
- Use floor-standing cabinetry, woodgrain finishes and engineered stone benchtops across the two rooms.
- Include bathroom wall tiling, mirrors and chrome tapware and accessories.
These details describe the proposed design. Product selections were provisional and some were marked for changes; the completed project is shown in the photographs above.
Explore more bathroom renovations by Bathrooms Are Us, or browse the completed renovation projects for other examples of the team’s work.
Project budget and timeframe
Bathrooms Are Us supplied a $34,500 project budget and a two-month completion timeframe for the main bathroom and powder room renovation.
These figures relate to this past project. They are not a current quotation or a fixed price for other renovations. Scope, selections and site conditions affect the cost and timeframe of each project.
The starting point
Before the renovation
Five photographs from the Redcliffe project before renovation work began.
Planning the two spaces
The proposed layouts
The main bathroom plan brings showering, vanity storage and laundry functions into the room’s angled footprint. The separate powder room plan sets out a compact toilet and basin arrangement.
Conceptual drawings supplied by Bathrooms Are Us, dated 30 January 2019. Dimensions and specifications were subject to site verification; final products, colours and layouts may vary. Original designs © Bathrooms Are Us.
Planning your own bathroom renovation?
Talk to Bathrooms Are Us about your bathroom, the layout you have in mind and your budget. Call the team or request a free estimate to discuss your project.







